Unlike most products sold online, a made-to-measure blind does not exist at the moment it is paid for. It must first be cut, assembled, inspected and packed, and only after that can it be collected by a courier. For this reason, blinds lead times are a common source of frustration for customers, many of whom are accustomed to next-day delivery on almost everything else they order online.
In this article, we look at how lead times can be presented properly on a blinds website, including what should be counted, where the date should be displayed, how it can be configured on your store platform and what customers should be told once their order has gone into production. The same principles apply to curtains and shutters, as well as any other window treatment lead time that needs to be shown online.
See How Our Experts Can Drive More Traffic to Your Website!
SEO: Boost your rankings and drive more organic traffic today!
Website Design/Development: Create a stunning website that converts visitors into customers.
Paid Media: Reach the right audience at the right time with expertly managed paid media.
Why Blinds Lead Times Matter More Than Most Delivery Times
For most online stores, delivery time is largely a question of shipping. In the case of blinds, however, shipping is usually the shorter part of the overall wait.
Made-to-Measure Blinds Delivery Time Starts After the Order
Made to measure blinds delivery time is made up of two separate stages. In the first stage, the blind is manufactured to the customer’s measurements, and in the second stage, it is shipped. A customer who sees “3 to 5 day delivery” and assumes that this figure covers both stages is likely to be disappointed two weeks later, even when nothing has gone wrong in production.
For this reason, the figure that matters on a blinds website is the total time, meaning production plus delivery, counted from the day on which the order is placed. If only the courier’s portion is shown, the customer is given the wrong expectation from the very beginning.
What Happens When a Store Stops Giving Dates
After missing a number of promised dates, some businesses decide to stop providing delivery dates altogether. While this decision is understandable, it often leads to more problems rather than fewer. When no date is given, customers tend to assume their own, which is usually more optimistic than reality, and they then contact the store to ask where their order is.
In our experience, a realistic date range based on actual production times is a far better approach. It answers the customer’s question before it needs to be asked, and it also gives the customer service team a consistent reference point when inquiries do come in.
What Is Product Lead Time for Blinds and Curtains?
In general business terms, lead time refers to the period between an order being placed and the goods being delivered. For a store that sells made-to-measure products, however, product lead time usually refers to the production stage alone, meaning the time the workshop or manufacturer needs before the item is ready for dispatch.
Production Time vs Delivery Time
Even if customers only ever see the total, it is useful to keep these two figures separate within the store’s setup.
Production time depends on the product in question and on the factory that makes it. Blinds delivery time, on the other hand, depends on the courier, the destination and the size of the parcel. When the two are stored separately, either one can be changed without affecting the other. For example, if a fabric supplier is running behind schedule, the production time for that fabric can be extended on its own, and if a courier changes its service levels, the delivery time for the affected region can be updated independently. Many manufacturers already publish their lead times in this way, listing production in working days and noting that freight is added on top.
How Long Do Blinds Take to Make?
There is no single answer to the question of how long do blinds take to make, and this is precisely why a store needs a set of rules rather than one fixed number. As a general guide, a plain roller blind in a fabric that is held in stock tends to be among the quicker products to produce. Specialty fabrics, honeycomb and pleated styles, shutters in custom paint colors and motorized products can all take considerably longer. Curtains delivery time also varies, depending on the type of lining, the heading style and whether a track or pole is being supplied with the order.
The most accurate way to answer this question on a website is product by product, expressed in working days, together with a brief note explaining that delivery time is added afterwards.
Setting Lead Time Rules by Product and Fabric
Reliable delivery dates depend on well-defined rules, and the majority of the work in this area takes place at this stage, well before any date appears on a product page.
| Product type | What usually changes its lead time | How to show it |
|---|---|---|
| Roller and Roman blinds | Fabric availability, motorization | Working days by fabric group |
| Pleated and honeycomb blinds | Specialty fabrics, size limits | Separate rule for each style |
| Shutters | Material, custom colors, imported or local production | Longer range, shown before checkout |
| Made-to-measure curtains | Lining, heading style, track or pole included | Range by curtain type |
| Samples | Stock on hand | Short, fixed dispatch time |
Working Days, Weekends and Public Holidays
Since production only takes place on working days, the date calculation should exclude weekends and public holidays. Where the manufacturer is located in a different country from the customers, the manufacturer’s holidays should be applied to the production stage and the customer’s regional holidays to the delivery stage. An order placed on a Friday afternoon and one placed on the following Monday morning may therefore receive quite different dates, and the store should be able to calculate this automatically, without anyone having to consult a calendar.
Order Cut-Off Times and Seasonal Shutdowns
The majority of workshops operate with a daily cut-off time, so that orders received before it enter production on the same day, while orders received after it begin on the next working day. This cut-off should also form part of the calculation.
Seasonal shutdowns are even more significant. A large number of manufacturers close over the end-of-year holiday period and publish their final order dates well in advance, in some cases several weeks ahead for the products that take longest to make. During the period leading up to these dates, the website should display them prominently, so that customers do not place orders in early December in the expectation of receiving their blinds before the holidays when this is no longer possible.
Pulling Lead Times From the Configurator
Because the configurator already records which fabric, size and control option the customer has selected, it is also in a position to identify which lead time rule applies, and to pass that information to the product page and the cart. If a shopper changes from a stocked fabric to a specialty fabric, the date displayed should be updated immediately, in the same way that the price is. This connection is something we include as part of blinds product configurator development, since the selections that affect the price very often affect the lead time as well.
How to Show an Estimated Delivery Date on a Blinds Website
Once the rules have been established, the remaining question concerns where and how the estimated delivery date should be displayed. Its placement has a considerable effect on how customers interpret it.
Show the Delivery Date on the Product Page
The most effective location to show delivery date on product page is close to the price and the add to cart button, which is where customers are making their decision. If the date is placed inside a shipping tab or within a set of frequently asked questions at the bottom of the page, it is unlikely to be noticed at all.
The wording should be brief and specific. For instance, “Made to order. Estimated delivery: 18 to 22 November” gives the customer considerably more useful information than “Usually ships in 2 to 3 weeks.” Where the date changes according to the options selected, the customer is also able to see exactly how their choices affect the timing of their order.
Date Ranges or Exact Dates?
For made-to-measure products, a date range is generally a safer option than a single fixed date. An expected delivery date range allows for the minor delays that occur in any workshop, while still providing the customer with something concrete to plan around. Where production is very consistent, a narrower range may be appropriate, whereas in busier seasons, when production times vary more, it is better to widen the range than to miss the dates that have been given.
Whichever approach is chosen, it should be applied consistently. Displaying a range on the product page but a single date in the confirmation email is likely to cause confusion.
Repeating the Delivery Date Estimate in Cart and Checkout
The delivery date estimate should remain visible throughout the cart and checkout, rather than appearing only once on the product page. For orders that contain several items, either the latest date should be shown, or a separate date should be given for each item if they are to be delivered separately. The same estimate should then be included in the order confirmation email, so that the customer has a written record of it.
Setting Up Lead Times on Shopify, WooCommerce and Magento
None of the three main ecommerce platforms calculates a made-to-order delivery date in the way that a blinds store requires as a standard feature. Each of them, however, can do so effectively when configured correctly.
Shopify Lead Time and Made-to-Order Dates
On Shopify, lead time information is generally stored against products or variants by means of metafields, which are then read by the theme or by an app in order to calculate and display the date. This is the approach most stores take to Shopify lead time for Shopify made to order products. The main difficulty for a blinds store is that the lead time frequently depends on the selections made in the configurator rather than on a fixed variant, which means the calculation has to take into account what the customer has actually chosen. Providing an estimated delivery date Shopify customers can rely on therefore usually involves a combination of theme development and custom logic, which forms part of building Shopify made to measure blinds stores correctly.
WooCommerce Lead Time and Estimated Delivery Dates
WooCommerce offers complete control over the way in which dates are calculated, whether through plugins or through custom code. A well-designed WooCommerce lead time setup reads the production rules for each product, excludes weekends and holidays, and displays the result on both the product page and the checkout. For Motorised Blinds, a UK retailer of made-to-measure blinds, we developed a custom delivery plugin that includes holiday dates, Standard or Next Day options configured for each product, and delivery estimates that exclude weekends and public holidays. This type of estimated delivery date WooCommerce configuration is covered in more detail under WooCommerce development for blinds and curtains stores.
Magento Delivery Date Rules for Larger Catalogs
Magento is well suited to stores with large fabric ranges, trade customers or more than one storefront. Delivery date rules on Magento are typically added by means of an extension or a custom module, often linked to product attributes and supplier settings, and the platform also allows stores to create their own order statuses to reflect their production stages. For catalogs involving a large number of suppliers and lead times, it is advisable to plan this functionality as part of the original build rather than adding it at a later stage. Our Magento development services can help to define the scope of this work.
Order Status Updates After Purchase
The date displayed at checkout effectively represents a commitment to the customer, and what takes place after the order has been placed largely determines whether the customer feels that this commitment has been met.
Production, Dispatch and Delivery Updates
The standard order statuses on most platforms were not designed with made-to-measure products in mind. In WooCommerce, for example, an order moves from “processing” to “completed,” which tells a blinds customer very little during a production period that may last several weeks. By adding statuses such as “in production,” “quality check” and “dispatched,” the store gives customers a clearer picture of where their order stands. The same principle applies to the WooCommerce order status section within the customer account and to the Shopify order status page, which can display production progress with a certain amount of customization.
Each change in status can trigger a short email or text message. Customers do not require daily updates, but they do want to know that production has started, that the order has been dispatched and when they should expect the courier to arrive.
Telling Customers About Delays Early
Delays are an unavoidable part of manufacturing, whether because a fabric arrives late, a machine breaks down or a holiday backlog builds up. The least effective way of handling a delay is to say nothing and allow the customer to discover it when the promised date has already passed.
A short message sent as soon as the delay is known, together with a revised date, is generally received much better than an apology after the event. Remakes are a particular case, because when a blind has to be produced again as a result of a measuring error, the lead time begins again from the start. This is one further reason why a clear blinds measuring guide and measuring flow is worthwhile long before any order is shipped.
Conclusion
Blinds lead times are never going to be as short as next-day delivery, and in most cases customers do not expect them to be. What they do expect is a date on which they can rely. By setting rules for each product and fabric, counting working days and holidays, displaying the result at the point where customers make their decision and keeping them informed while the order is in production, a store can prevent the waiting period from becoming a source of complaints.
Icecube Digital builds blinds and curtains stores on Shopify, WooCommerce and Magento, including configurators and the delivery date logic that supports them. Contact Icecube Digital to set up lead times and delivery dates that your customers can rely on.
Frequently Asked Questions
Should lead times be shown in working days or calendar days?
Lead times should be calculated in working days, since this reflects the way in which production actually operates. When the result is shown to customers, however, it should be converted into calendar dates or a date range, because most people find “arrives 18 to 22 November” easier to understand than “12 to 15 working days.”
What if a customer orders items with different lead times?
There are two possible approaches. The store can either ship all of the items together and display the latest date, or ship each item as soon as it is ready and display a separate date for each one. Where shipments are to be split, this should be stated clearly at checkout, so that the customer is not surprised when only part of the order arrives.
Is it worth offering paid express production?
For some stores it can be, particularly in the period before the holidays. It is only worthwhile, however, if the workshop is genuinely able to move those orders to the front of the production queue, since offering an express service that cannot be delivered does more damage than not offering one at all.
How often should lead time rules be reviewed?
The rules should be checked whenever a supplier changes its production times, and again before each busy season. A simple monthly comparison between the dates that were promised and the dates on which orders were actually delivered will also show which products or fabrics need their ranges adjusted.
Do samples need a separate delivery date?
Yes. Samples are normally dispatched from stock within one or two days, so they should not carry the lead time of a full made-to-measure product. Setting a separate and shorter dispatch time for samples ensures that this part of the buying process remains quick.
Can delivery dates differ by region or country?
They should, where courier times vary between regions. The production time remains the same in every case, but the delivery time can differ considerably between a nearby city and a remote area, or between one country and another. Setting delivery times according to shipping zone keeps the final date accurate for every customer.
What should the confirmation email include about timing?
The confirmation email should include the same estimate that was shown at checkout, the date on which production is expected to begin and a brief note explaining when the customer will next hear from the store. Keeping this information consistent across the website and all emails reduces the number of inquiries about where an order is.